Home
The Harbour Infrastucture Services Harbour Rules Rates Contact Us


Langkawi Development Authority (LADA) has built the marine infrastructure and public berthing facility. This magnificent capacity is ready to be operating professionally under supervison of JG Challenge Sdn Bhd. Get in touch with Dock Master Mr Raden Munawar for further details. Mobile contact no: 012 297 9195.

A basin area of 27 acres was created and designed for public berthing of crafts in various sizes. A number of berths are allocated for term lease or tenancy. Berthing is either at the Mega Yacht Pier (stern-to mooring) or Marina Pier, to the floating pontoons. There are also 8 Swing Moorings, a 40m Landing and 36m Fuel Dock as well as a dedicated Fisherman Pontoon within the basin;

05 - berths up to 6.00m by 2.50m
02 - berths up to 8.00m by 3.00m
15 - berths up to 10.00m by 4.00m
17 - berths up to 12.00m by 4.50m
17 - berths up to 15.00m by 5.00m
02 - berths up to 20.00m by 6.00m
02 - berths up to 25.00m by 7.00m
07 - berths up to 50.00m by 10.50m
08 - swing moorings up to 20.00m


Radio contact:
VHF Channel 72 CALL «TELAGA HARBOUR»

Weather service:
Harbour Office/Langkawi Meteorology Department


 
     

Copyright © 2003 Telaga Harbour Park. All rights reserved. Please see our disclaimer.